Saturday, July 05, 2008

Final stretch

18:26 05/07/2008 5.19 miles 7 locks
very wet start to the day so didn't hurry. Then made a dry run up to the Watford flight, we were second in the queue to go up with 5 coming down. This took about an hour as nothing can hurry progress through the locks. Eventually we cleared the locks and headed for the Crick tunnel (wet as usual) and our home mooring. Just got back in time to beat the rain.
Sitting quietly in the marina now gathering our strength for all the packing and tidying up required.
Water here does not need to be boiled!

No comments: